• Home
  • About Us
  • ACCOLADES
    • Awards
    • Recognition
  • PARK ACTIVITY
    • Educational Awareness
    • Environmental Awareness
    • Workshop
      • Butterfly Identification and Monitoring Workshop
      • Spending Time with Butterflies
  • CSR PROJECT
    • Completed Projects
      • Water Restore Management Projects
      • RET Garden (Rare Endangered Threatened Garden)
      • Seed Bank
      • Nurturing NBR Trees for Long-term Afforestation and Conservation at NBNP
    • Future Projects
      • Enhancing Groundwater Recharge through a Sustainable Water Retention Structure (5.5 Lakhs)
      • Propagation and Conservation of Aromatic Plants Western Ghats (4 Lakhs)
      • Tree Guard Installation for Protection of Young Saplings
  • AMENITIES
  • PORTFOLIO
    • Conservation Day
    • Fauna
    • Flora
    • Visitors
  • BLOG
    • Butterfly
  • Outbound Training
  • Nursery
  • Contact Us
  • Home
  • About Us
  • ACCOLADES
    • Awards
    • Recognition
  • PARK ACTIVITY
    • Educational Awareness
    • Environmental Awareness
    • Workshop
      • Butterfly Identification and Monitoring Workshop
      • Spending Time with Butterflies
  • CSR PROJECT
    • Completed Projects
      • Water Restore Management Projects
      • RET Garden (Rare Endangered Threatened Garden)
      • Seed Bank
      • Nurturing NBR Trees for Long-term Afforestation and Conservation at NBNP
    • Future Projects
      • Enhancing Groundwater Recharge through a Sustainable Water Retention Structure (5.5 Lakhs)
      • Propagation and Conservation of Aromatic Plants Western Ghats (4 Lakhs)
      • Tree Guard Installation for Protection of Young Saplings
  • AMENITIES
  • PORTFOLIO
    • Conservation Day
    • Fauna
    • Flora
    • Visitors
  • BLOG
    • Butterfly
  • Outbound Training
  • Nursery
  • Contact Us

Water Restore Management Projects

Water Restore Management Projects completed under this initiative are listed below:
  • Sponsored by M/s Magna Electro Castings Ltd; Project cost Rs.5 Lakhs at of completion-2019
 
  • Sponsored by M/s ELGI Equipments Ltd; Project cost Rs.2.5 Lakhs as of June 2024. Work is under Process
1.Rainwater Harvesting ( 12 Nos) Purpose: To maximize the collection and use of rainwater for the park’s ecosystem and maintenance needs. Features:
  • Installation of rainwater harvesting systems in strategic areas across the park to capture rainwater from rooftops and open spaces.
  • The collected rainwater will be used for irrigating plants, maintaining gardens, and replenishing the park’s water bodies, reducing dependency on external water sources. Storage tanks and filtration systems will be integrated to ensure the quality and longevity of the harvested water.
  • The project aims to promote water sustainability and educate visitors on the importance of rainwater harvesting in reducing water scarcity, especially in drought-prone areas.
2.Check Dam(25 Nos) Purpose: To enhance groundwater recharge and prevent soil erosion by controlling the flow of water during rains. Features:
  • Construction of a new check dam in a designated area within the park to help manage the flow of rainwater and retain water for longer periods.
  • The check dam will help in recharging the groundwater levels, contributing to improved water availability throughout the year, especially during the dry season.
  • It will prevent the runoff of rainwater, allowing it to seep into the ground, thus reducing soil erosion and maintaining the health of the surrounding vegetation.
  • This project aligns with NBNP’s existing efforts, such as the desilting of wells and rainwater retention systems, which have successfully increased water levels in the park.
  • The check dam will also serve as an example of sustainable water management practices, demonstrating how nature-based solutions can mitigate water scarcity and improve ecosystem resilience.
These projects will not only support the park’s biodiversity but also promote sustainable water management, helping NBNP serve as a model for eco-friendly conservation practices.
Chech dam Photo 3Chech dam Photo 3
Check dam PhotoCheck dam Photo
Check Dam 5Check Dam 5
Check Dam 6Check Dam 6
Check Dam 7Check Dam 7
Check Dam 8Check Dam 8
Check Dam 9Check Dam 9
check dam 10check dam 10
check dam 11check dam 11
check dam 14check dam 14
check dam 15check dam 15
Check dam Photo 1Check dam Photo 1
Check Dam Photo 4Check Dam Photo 4
Copyrights 2024. Nilgiri Biosphere Nature Park. All Rights Reserved | Maintained by the Systems Department, GRG Institutions